As principal contractor you carry your own file and answer for everyone else's — subcontractors included.
Generate your safety file — R500What the law requires
There is no separate safety file law for building contractors. The Occupational Health and Safety Act 85 of 1993 and the Construction Regulations 2014 are national and trade-neutral — they apply to building contractor work exactly as they apply to every other trade on a South African site, with no minimum project size exemption.
What changes with the trade is the content. The regulations require the file to reflect the work actually being carried out, so the risk assessments, method statements, appointments and registers in a building contractor file are driven by the hazards building contractors actually create.
Why a building contractor file is different
A building contractor's file is usually the largest on site, because the principal contractor's duties under the Construction Regulations 2014 extend past their own crew. You have to be able to show your own compliance and demonstrate that you checked and held the files of every subcontractor working under you.
What to get right in a building contractor safety file
These are the hazards that should be reflected properly in the risk assessments and method statements — the parts of the file that are easiest to leave generic and hardest to defend when they are.
Subcontractor files are your exposure
Regulation 7 puts the principal contractor in the position of having to take reasonable steps to ensure subcontractors comply. In practice an inspector asks for the sub's file and it is your problem when it is missing. Your file needs a register of subcontractors with the status of each one's documentation.
Notifying the Department of Employment and Labour
Regulation 4 requires construction work to be notified to the Provincial Director at least seven days before it starts when it involves the activities the regulation lists — excavation, work at height with a risk of falling, demolition or the use of explosives, among others. The notification, and proof it was sent, belongs in the file — it is one of the first things asked for and one of the most commonly missing.
Appointments that lapse mid-project
Construction supervisors, assistants and the various competent persons are appointed in writing to a specific project. On long builds these get made once and never revisited when people leave. An appointment register with dates is what keeps this honest.
Documents a building contractor scope typically triggers
On top of the core compliance pack every construction file carries, building contractors should expect to need these. The exact set depends on your scope.
- —Notification of construction work form (Regulation 4)
- —Construction manager and supervisor appointments (CR 8.1, 8.7, 8.8)
- —Principal contractor and sub-contractor appointments (CR 5.1(k), CR 7.1(v)) with the contractor management plan
- —Baseline and site-specific risk assessments
- —Construction health and safety plan
- —Incident/accident register and incident reporting and investigation procedure
Do I need a separate safety file for every project as a building contractor?
Yes. The health and safety plan and risk assessments have to reflect the site you are actually on — its hazards, its layout, its people. A file carried over unchanged from the last project is one of the most common reasons a file is rejected at the gate. Generating a fresh one per project is exactly what MySafetyFile is built to make cheap.
More background: what a construction safety file is and what a compliant template must contain.
Get your building contractor safety file in 8 minutes
MySafetyFile generates a complete, site-specific construction safety file — drawn from a library of 351 documents across 9 categories — in about 8 minutes for R500. Register free, enter your project and scope, and download a file that is ready to print or submit. There is no monthly fee, and one account handles unlimited projects.
Every document is aligned with the OHS Act and Construction Regulations 2014, developed by a SAIOSH-registered practitioner, and carries a unique identification code that ties it to the account and project it was generated for.